Showing images available in: United States
GAP Gardens - Homepage
x

Select Required Country

 
After weeks of flooding, a riverside deck has to be completely rebuilt. The first step is to remove the hardwood decking planks, revealing the softwood subframe which is rotting in parts because a build-up of wet mud has been deposited between the joists.
   

After weeks of flooding, a riverside deck has to be completely rebuilt. The first step is to remove the hardwood decking planks, revealing the softwood subframe which is rotting in parts because a build-up of wet mud has been deposited between the joists.


Credit:
GAP Photos/Nicola Stocken
 
 
 

"Quick Buy" Licenses:


Digital Media - Single page or single post, excludes advertising - Up-to 640x480 pixels - 5 Years 


Editorial Licenses (size on page):
  
  
Editorial - Book/Magazine/Newspaper in Single Territory - Single use in one edition - Print-run up to 250,000 copies 




 
 
 (account holders only)
 

 

©   All images subject to Copyright. Images available for use by business-to-business license only.

 
Photographer: Nicola Stocken - See more from this photographer
 
Image Number:   0507481
 
Image Size:   7192 x 4800 px
60.89 x 40.64 cm | 24 x 16 Inches | @300dpi

 
Property Release:   No  
Clearance may be available on request

 
Model Release:   No  
Clearance may be available on request

 

 
Keyword Shortcuts:
after weeks flooding riverside deck has to be completely rebuilt first step is to remove hardwood decking planks revealing softwood subframe which is rotting parts because build-up wet mud has been deposited between joists ockwell staith gardens summer urban city town suburban practical gardening waterside rotten timber wooden renovating renovation steps series sequence construction hard landscaping
 

x
After weeks of flooding, a riverside deck has to be completely rebuilt. The first step is to remove the hardwood decking planks, revealing the softwood subframe which is rotting in parts because a build-up of wet mud has been deposited between the joists.

After weeks of flooding, a riverside deck has to be completely rebuilt. The first step is to remove the hardwood decking planks, revealing the softwoo...


 Image Number:   0507481 

CALCULATE LICENSE

 OR 

 

License Starts 

 

excl. VAT $0 USD


Image Ref
EC Usage Ref
Territory Required
Users Currency
GBP Price
Items in Cart
License Start Date
Usage Question

 

 

 
CONNECT WITH US            
+44 (0)1376 571283
[email protected]
Sign-Up for Newsletter
 


  © GAP Photos Ltd, All Rights Reserved